---
title: Sample Financial Diagnostic | Site Growth Partners
description: Five pages of a finished Financial Diagnostic for an independent clinical research site. Fictional figures, real format and method.
---

[SITE GROWTHPARTNERS](https://www.sitegrowthpartners.com/?hsLang=en) Financial advisory for independent clinical research sites

[Services](https://www.sitegrowthpartners.com/services?hsLang=en)[Sample](https://www.sitegrowthpartners.com/sample?hsLang=en)[About](https://www.sitegrowthpartners.com/about?hsLang=en)[Score your site](https://www.sitegrowthpartners.com/scorecard?hsLang=en)

# What a finished Diagnostic looks like

Five pages from a Financial Diagnostic, built on a fictional site called Lakeside Clinical Research. Every figure here is invented. The format, the method, and the arithmetic are exactly what a real engagement produces — the tables foot, the ratios compute, and no client data appears anywhere.

[Download the PDF](https://www.sitegrowthpartners.com/hubfs/Site-Growth-Partners-Sample-Financial-Diagnostic-Live.pdf?hsLang=en) [Score your own site in four minutes](https://www.sitegrowthpartners.com/scorecard?hsLang=en)

SITE GROWTHPARTNERS

# Financial Diagnostic Sample Output

Five pages from a Financial Diagnostic, showing what an independent research site receives. Every figure here is fictional. The format, the method, and the arithmetic are exactly what a real engagement produces.

**Basis of presentation.** Operating results cover the LTM ended 30 September 2026. Balance sheet items — receivables, unbilled revenue, and holdbacks — are stated as of 30 September 2026. Trended exhibits show the twelve months then ended. All figures illustrative.

14

Active studies analyzed

$7.7M

Research revenue, LTM ended 30 September 2026

3

Locations

3 wks

Engagement length, fixed fee

What’s inside

| 01 | Contribution margin by studyRevenue less direct cost, ranked, with site labor as a percent of study revenue. |
| --- | --- |
| 02 | Cash conversionDSO by payer against contracted CTA terms, trended monthly, plus unbilled revenue, invoiceables performed and never billed, and holdbacks outstanding at closeout. |
| 03 | CapacityRevenue per FTE trended monthly, coordinator utilization, and where every non-study hour goes. |
| 04 | Backlog and forward viewContracted backlog rolled forward, a twelve-month revenue outlook, and the share of contracted value your closed studies have historically realized. |
| 05 | FindingsEvery one with a dollar amount, separated into recurring margin, one-time cash, capacity, and forward conversion. |
| 06 | What the full engagement includesThe cost architecture, root-cause analysis, and forward pricing position behind these pages. |

Illustrative — fictional site, fictional figures

## Contribution margin by study

Lakeside Clinical Research · revenue less direct cost, ranked

Page 01**Study economics***LTM ended 30 September 2026 · site labor allocated*

34.7%

Blended contribution margin

77%

Of all margin from 5 of 14 studies

28.0%

Site labor as a percent of revenue

$185K

Annual value of repricing the bottom quartile

| Study | Protocol | Revenue | Site labor % | Direct cost | Contribution | CM % |  |
| --- | --- | --- | --- | --- | --- | --- | --- |
| LCR-0433 | RSV Vaccine, Ph 3Sponsor-direct | $521,000 | 18.8% | $251,000 | $270,000 | 51.8% |  |
| LCR-0470 | Atopic Dermatitis, Ph 2Sponsor-direct | $648,000 | 21.8% | $349,000 | $299,000 | 46.1% |  |
| LCR-0455 | Psoriatic Arthritis, Ph 3Sponsor-direct | $884,000 | 22.2% | $486,000 | $398,000 | 45.0% |  |
| LCR-0412 | Rheumatoid Arthritis, Ph 3Sponsor-direct | $1,412,000 | 22.5% | $783,000 | $629,000 | 44.5% |  |
| LCR-0388 | Type 2 Diabetes, Ph 3CRO | $1,106,000 | 23.7% | $660,000 | $446,000 | 40.3% |  |
| LCR-0421 | Heart Failure, Ph 3CRO | $742,000 | 28.8% | $505,000 | $237,000 | 31.9% |  |
| LCR-0448 | Sjogren’s, Ph 2Sponsor-direct | $294,000 | 28.6% | $205,000 | $89,000 | 30.3% |  |
| LCR-0462 | Chronic Kidney Disease, Ph 2CRO | $438,000 | 33.8% | $337,000 | $101,000 | 23.1% |  |
| LCR-0399 | Lupus, Ph 3CRO | $596,000 | 35.6% | $464,000 | $132,000 | 22.1% |  |
| LCR-0381 | Hypertension, Ph 3 — in closeoutCRO | $248,000 | 34.7% | $195,000 | $53,000 | 21.4% |  |
| LCR-0407 | Osteoarthritis, Ph 3CRO | $367,000 | 36.0% | $296,000 | $71,000 | 19.3% |  |
| LCR-0476 | Alopecia Areata, Ph 2CRO | $186,000 | 41.9% | $172,000 | $14,000 | 7.5% |  |
| LCR-0481 | Migraine, Ph 2 — first yearSponsor-direct | $96,000 | 63.5% | $116,000 | -$20,000 | -20.8% |  |
| LCR-0394 | Post-Surgical Pain, Ph 3 — rescueCRO | $152,000 | 79.6% | $202,000 | -$50,000 | -32.9% |  |
|  | Total — 14 active studies | $7,690,000 | 28.0% | $5,021,000 | $2,669,000 | 34.7% |  |

#### Site labor is the variable that separates this book

The three studies carrying site labor above 40% of revenue are the same three at the bottom on contribution margin. Every site knows which studies feel busy. Almost none can show which ones consume labor out of proportion to what they pay — because almost no site codes coordinator time to a study. Establishing that coding is part of what this engagement sets up, and it takes a coordinator under five minutes at the end of a day.

**Basis — site labor.** Where study-level time coding is not yet in place, site labor is allocated. Allocated figures rank studies and surface outliers reliably. Measured figures, produced once coordinator time is coded to studies, are what support pricing a budget. Method and limits are documented in the full report.

Direct cost comprises site labor attributed to the study, investigator fees, procedures and pass-throughs, and other study-specific cost. Site overhead and SG&A sit below this line.   
Illustrative — fictional figures

## Cash conversion

Where work performed stops short of money received

Page 02**Cash***Receivables as of 30 September 2026*

94

Blended DSO, days

54

Weighted average contracted CTA days

$612K

Earned, not yet invoiced

$392K

Released at a 75-day blended target

Blended DSO by month — LTM ended 30 September 2026

75100125150 TARGET 75 DAYS94 DAYS TODAY818483888691899390959294Oct 25NovDecJan 26FebMarAprMayJunJulAugSep

DSO by payer against contracted terms

| Sponsor or CRO | Revenue | Receivable | CTA days | Actual DSO | Variance / % of term | 12-mo trend |
| --- | --- | --- | --- | --- | --- | --- |
| Calder TherapeuticsSponsor-direct | $1.2M | $179K | 60 | 56 | -4 (93%) |  |
| Northwind PharmaSponsor-direct | $1.4M | $201K | 45 | 52 | +7 (116%) |  |
| Ashford BioSponsor-direct | $890K | $132K | 45 | 54 | +9 (120%) |  |
| Benchmark CROCRO | $1.1M | $403K | 60 | 133 | +73 (222%) |  |
| Verity ClinicalCRO | $1.3M | $517K | 60 | 141 | +81 (235%) |  |
| Other sponsors & CROsMixed | $1.8M | $540K | 52 | 111 | +59 (213%) |  |
| Blended | $7.7M | $2.0M | 54 | 94 | +40 (174%) |  |

Cash sitting outside the receivable

Earned, not yet invoiced$612,000

Invoiceables performed, never billed$148,000

Holdbacks outstanding at closeout$214,000

What a 94-to-75 day move is worth

Receivable at 94 days$1,972,000

Receivable at 75 days$1,580,000

**One-time working capital release**$392,000

CTA days is the revenue-weighted payment term written into your own contracts. Variance is the gap between what you agreed to and what you are actually collecting, shown in days and as a percent of the agreed term. Green is at or inside term, amber to 150% of term, red beyond. A 75-day blended target is deliberately achievable — it is a level independent sites reach, not a theoretical floor.   
Illustrative — fictional figures

## Capacity

What the current team produces, and what it could

Page 03**Capacity***LTM ended 30 September 2026*

$40,052

Average monthly revenue per FTE

59.4%

Coordinator utilization, 9 coordinators

7,593

Paid hours not coded to a study

$719K

Capacity freed at a 65% utilization floor

Revenue per FTE by month — 16 site FTE

$15K$25K$35K$50K$13.8K$18.4K$22.1K$27.6K$32.4K$36.9K$41.2K$48.5K$54.8K$60.2K$63.9K$60.8KSTRONG $35K+BELOW $15KOct 25NovDecJan 26FebMarAprMayJunJulAugSep

Coordinator utilization

| Coordinator | Paid hrs | Study | Util. |  |
| --- | --- | --- | --- | --- |
| Coordinator A | 2,080 | 1,789 | 86% |  |
| Coordinator B | 2,080 | 1,664 | 80% |  |
| Coordinator C | 2,080 | 1,498 | 72% |  |
| Coordinator D | 2,080 | 1,310 | 63% |  |
| Coordinator E | 2,080 | 1,248 | 60% |  |
| Coordinator F | 2,080 | 1,123 | 54% |  |
| Coordinator G | 2,080 | 977 | 47% |  |
| Coordinator H | 2,080 | 811 | 39% |  |
| Coordinator I | 2,080 | 707 | 34% |  |
| Total | 18,720 | 11,127 | 59.4% |  |

Where the 7,593 non-study hours go

| Category | Hours | % non-study | % of paid |
| --- | --- | --- | --- |
| Pre-award, feasibility, and site qualification | 2,354 | 31% | 12.6% |
| Training, regulatory, and administrative | 2,126 | 28% | 11.4% |
| Travel between locations | 1,063 | 14% | 5.7% |
| Unallocated / not coded | 2,050 | 27% | 11.0% |
| Total non-study | 7,593 | 100% | 40.6% |
| Study-coded | 11,127 | — | 59.4% |
| Total paid hours | 18,720 | — | 100.0% |

Utilization is rated red below 50%, amber from 50% to 70%, and green above 70%. Independent sites typically run 55–60% on average, with the strongest coordinators reaching 80–90%.

Revenue per FTE is total research revenue over total site FTE, monthly. Bars are rated red below $15K, amber to $25K, light green to $35K, and dark green above. $25K–$35K is a solid range for an independent site; sustained performance above $35K is strong. It varies by therapeutic area, so it is most useful as a trend against your own history.   
Illustrative — fictional figures. Utilization band is Site Growth Partners’ own analysis.

## Backlog and forward view

What is contracted, what it converts to, and what the next twelve months look like

Page 04**Backlog***Backlog as of 30 September 2026*

$8.8M

Contracted backlog remaining

13.7

Months of revenue coverage at current burn

$8.9M

Next twelve months, backlog plus weighted pipeline

69%

Of contracted value realized on closed studies

Backlog rollforward — LTM ended 30 September 2026

| Quarter | Opening backlog | Awards added | Revenue recognized | Scope adjustments | Closing backlog |
| --- | --- | --- | --- | --- | --- |
| Q1 FY26 Oct–Dec 25 | $8,900,000 | +$1,840,000 | (1,793,000) | (120,000) | $8,827,000 |
| Q2 FY26 Jan–Mar 26 | $8,827,000 | +$2,410,000 | (1,718,000) | (95,000) | $9,424,000 |
| Q3 FY26 Apr–Jun 26 | $9,424,000 | +$1,560,000 | (2,207,000) | (180,000) | $8,597,000 |
| Q4 FY26 Jul–Sep 26 | $8,597,000 | +$2,390,000 | (1,972,000) | (210,000) | $8,805,000 |
| Full period | $8,900,000 | +$8,200,000 | (7,690,000) | (605,000) | $8,805,000 |

Forward revenue by month — next twelve months

$250K$500K$750K$648K$656K$667K$690K$716K$740K$761K$780K$799K$813K$826K$837KContracted backlogWeighted pipelineOct 26NovDecJan 27FebMarAprMayJunJulAugSep

#### Contracted value is not realized value

Across studies that reached closeout in the last twenty-four months, $6,240,000 of contracted value produced $4,312,000 of recognized revenue — 69%. The $1,928,000 difference is enrollment shortfall, screen failures that were never reimbursed, and contracted scope that was never executed or never billed. Every site signs contracts. Almost none measures what share of them turns into money, which means almost none knows whether a budget that looks good on paper has ever actually paid out.

Backlog is remaining contracted value on active and awarded studies, net of revenue recognized. Weighted pipeline is awarded-but-not-started and pre-study-visit opportunities at their historical conversion rate. Revenue recognized ties to the LTM ended 30 September 2026 total on page 01.   
Illustrative — fictional figures

## Findings

Prioritized, with a dollar amount on every line

Page 05**Findings***LTM ended 30 September 2026*

01

#### Three studies carry site labor far above the book

Site labor runs 28.0% of revenue across the portfolio. On LCR-0394 it is 80%, on LCR-0481 64%, and on LCR-0476 42%. Those three are the bottom three on contribution margin. The labor line is the cause, not a coincidence, and none of the three budgets was modeled against cost to deliver before signature.

Annual drag$70,000

02

#### The bottom four studies carry 10.4% of revenue and almost none of the margin

$801,000 of revenue produced $15,000 of contribution. Repricing this quartile to a 25% floor — the level the rest of the book clears comfortably — is worth $185,250 a year. This quartile contains the studies in finding 01, so the two amounts are not additive.

Recurring$185,250

03

#### Two CRO relationships are running 73 and 81 days past their own contract terms

Sponsor-direct payers settle within 9 to 24 days of CTA terms. Verity Clinical contracts at 60 days and pays in 141; Benchmark CRO contracts at 60 days and pays in 133. Blended DSO has drifted from 81 to 94 days over the period. Reaching a 75-day blended target releases $392,000 of working capital, once.

One-time$392,000

04

#### Procedure-level invoiceables are not being captured

A walk of each budget against the visit schedule identified $148,000 of billable procedures and pass-throughs performed and never invoiced. This repeats every year it goes unfixed.

Recurring$148,000

05

#### Holdbacks from closed studies were never pursued

$214,000 in contract holdbacks is outstanding across studies that have completed closeout. There is no tracking mechanism and no owner.

One-time$214,000

06

#### Four in ten paid coordinator hours are not coded to a study

Utilization averages 59.4% against a 55–60% norm, with a spread from 34% to 86%. At $691 of revenue per study-coded hour, lifting every coordinator to a 65% floor frees 1,041 hours — $719,331 of delivery capacity without adding headcount.

Capacity$719,331

07

#### Contracted value is not converting, and the rate is not being measured

Studies that reached closeout in the last twenty-four months realized 69% of their contracted value — $4,312,000 against $6,240,000. Applied to the $8.8M of backlog on the books today, that same rate implies $6,084,481 of revenue rather than the contracted figure. Lifting realization to 80% is worth $960,000 on the current backlog alone. It is a pricing and enrollment-assumption problem before it is a billing problem.

Forward$960,000

$333,250

Recurring, every year  
Margin repricing and uncaptured invoiceables

$606,000

One-time cash  
Holdback recovery and working capital release

$719,331

Delivery capacity  
Available without adding headcount

$960,000

Forward book  
Value of lifting realization on contracted backlog

Capacity is not income. It is revenue the current team could deliver at today’s revenue per study-coded hour if utilization reached a 65% floor. The forward figure is not revenue either — it is what the backlog already on the books is worth at a better realization rate. The four are deliberately not summed: a recurring margin gain, a one-time balance sheet release, unused capacity, and forward conversion are four different kinds of money and adding them would misrepresent all four.   
Illustrative — fictional figures

## What the full engagement includes

These five pages are the output. Most of the work is underneath them.

Page 06**Scope**

| Component | Where it appears |
| --- | --- |
| Contribution margin by studyRevenue less direct cost, ranked, with site labor as a percent of study revenue. | Page 01 |
| Cash conversionDSO by payer against contracted CTA terms, trended monthly, plus unbilled revenue, invoiceables performed and never billed, and holdbacks outstanding at closeout. | Page 02 |
| CapacityRevenue per FTE trended monthly, coordinator utilization, and where every non-study hour goes. | Page 03 |
| Backlog and forward viewContracted backlog rolled forward, a twelve-month revenue outlook, and the share of contracted value your closed studies have historically realized. | Page 04 |
| FindingsEvery one with a dollar amount, separated into recurring margin, one-time cash, capacity, and forward conversion, sequenced by payback. | Page 05 |
| Cost architectureThe piece nobody has: a mapped view of where money leaves — how investigators are actually paid, what vendor agreements cost per unit when they were never written that way, and how imaging, lab, and centralized services get split across studies. This is what makes study-level margin possible at all, and most sites do not have it. | Full report |
| Operational root causeA strategy-level breakdown of what is actually driving margin and collection breakdowns — for example, EDC data-entry lag causing missed sponsor payment windows, which pushes the next payment cycle, which compounds. Problems named, with the mechanism traced. | Full report |
| Forward pricing positionWhat your next budget should look like. Fully loaded revenue and cost per visit, derived from study contract value against your enrollment goal and visit schedule, so the next CTA is negotiated from your numbers rather than the sponsor’s template. | Full report |
| Benchmark positionWhere your study margins sit against comparable studies by therapeutic area and indication — a comparison set that grows with every engagement and that no site can build alone. | Full report |

#### The reason a site can’t produce these pages itself

Study-level margin does not exist in any system a site already owns. It has to be constructed — by tracing how investigators are actually paid, what vendor agreements actually cost per unit — many were never written on a per-unit basis, and an imaging or lab contract used across several studies has to be unpicked before any of it can land on a study — and which centralized staff time belongs to a study versus the site versus overhead. That reconstruction is the engagement. The reporting is what falls out of it, and once it exists it keeps producing — every subsequent budget gets negotiated against a cost base you can defend.

#### What it is worth after the three weeks are over

The findings are the immediate return. The durable one is a cost-to-deliver position you can price from. Sponsors and CROs negotiate from their own template and their own comparables. Almost no independent site negotiates back from a measured cost per visit by therapeutic area. Each engagement also adds to a growing comparison set of study margins by therapeutic area and indication — a view no single site can build alone, and the one that tells you whether the budget in front of you is good.

**What we need from you to start.** Thirteen months of trial balances, P&L and balance sheet for the period, AR aging by payer, payroll detail by person, your study master with contract values, executed CTAs and budgets, vendor agreements, and assorted CTMS reports covering revenue recognized by study, visit and procedure completion, and enrollment. A full request list and a short intake interview come with the engagement letter. The clock starts when the data arrives, not when the agreement is signed.   
Illustrative — fictional figures throughout this document

**This is a sample.** Lakeside Clinical Research is not a real company. Every protocol, sponsor, coordinator, and figure in this document is invented for illustration. No client data appears anywhere.

 A Financial Diagnostic runs three weeks on a fixed fee, priced by study count and quoted before it starts. Site Growth Partners · sitegrowthpartners.com · Score your site in four minutes at sitegrowthpartners.com/scorecard

[SITE GROWTHPARTNERS](https://www.sitegrowthpartners.com/?hsLang=en)

Financial advisory for independent clinical research sites.  
Houston, Texas · [cschier@sitegrowthpartners.com](mailto:cschier@sitegrowthpartners.com)

[Services](https://www.sitegrowthpartners.com/services?hsLang=en)[Sample Diagnostic](https://www.sitegrowthpartners.com/sample?hsLang=en)[Scorecard](https://www.sitegrowthpartners.com/scorecard?hsLang=en)[About](https://www.sitegrowthpartners.com/about?hsLang=en)

Site Growth Partners provides financial advisory services. Nothing on this site is accounting, legal, tax, or investment advice, and no engagement exists until it is agreed in writing.